Tuesday, January 20, 2009

First Floor Sheathing

As you can see, the first floor is sheathed. They were laying down the second floor sheathing when I took these pictures. The south side of the addition is completely covered in sheathing. This is just temporary until they build the knee wall to support the windows and the jambs to separate them.

There's also a picture looking in through what will be the front door. You can see the openings directly ahead where the stairs will be and the smaller awning type window openings on the north wall.

Now that the weather is warm enough to work again, they plan to have the exterior completely framed and sheathed and the roof on by the end of the week.