They have the joists in for the first floor. These were taken at lunch today. Their goal was to get the first floor, the walls of the first floor and the second floor structure up today. With the frigid temperatures coming in over night, they probably won't work at the site tomorrow.
I also picked up the bathroom sink, sink faucet, bathtub/shower faucets tonight. I'll buy the vanity, mirror, toilet, and lights later this week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment